The Preserve at Dusk

 

 

 

 

 

 

 

 

 

 

 

 

As the project nears completion, we continue to place brick pavers at the parking lot and the covered patio. The front porch is being waterproofed. Interior floor coverings have been laid and trim, paint and ceilings are ongoing. We are making reparations for tree planting in the parking lot.

Preserving a Rich Tradition

 

 

 

 

 

 

Around the site, things are looking more and more complete. Brick pavers continue to be laid in the parking lot. We are installing mahogany and glass doors and finishing work on porches and exterior caulking. Ceramic tile are being installed in the lobbies and the stairs, along with ceiling tile and interior finishes.

For additional photos of architectural detail, visit our FlickR album.

From Parking to Porches

 

 

 

 

 

 

 

 

 

 

 

 

 

We’re continuing with all the finishing touches that make this building beautiful. Porches are getting details and parking lot brick pavers are being laid. Inside, there’s lots of fixturing going on. Cabinets and molding are in place.

 

 

 

Steeped in History

As we approach this job’s finish, more history is making its way onsite. The Tennessee Coal and Iron medallion was a mounted a few weeks back, and is now accompanied by a Pratt Shops sign circa 1920s and US Steel’s embossed metal doors. Porch construction and final details are progressing on schedule.

 

 

 

 

 

 

 

 

 

 

Details Make the Job, Inside and Out

As we make the final push to finish the US Steel Realty office, we are striving to complete the job with excellence.

 

 

 

 

 

 

 

 

 

 

Details make the job. This week, those aesthetics include brick work on the parking lot, interior paint, crown molding and ceramic tile. We are also pleased to say that safety has remanded top of mind. A steel stair rail and electrical meters for permanent power were both successfully installed.

We estimate an on-time completion, just after the new year.

Building Gets Finishing Touches

 

 

 

 

 

The veranda roof is dried-in. Progress is being made on the brick in the parking lot area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electrical service installation is moving forward throughout the building. We’re adding the finishing touches to the basement area, including crown molding.

 

Artist’s Vision is Close to Reality

The US Steel Realty building is looking more like it’s artist rendering. Paint has begun on the veranda side.

Brick work continues to progress at the gables and entrance arches.

As well as our electrical service area in place.

Drywall and finishes are progressing here on the second floor, and in the basement also.